A good whole house remodel checklist follows the order decisions actually get made: what the house needs to do, what shape the structure and systems are in, what you can spend, what goes in the walls and on the floors, permits, where you’ll live, and how the work gets sequenced. Settle those before anyone picks up a sledgehammer and the project mostly runs to plan. Skip them and you end up making expensive decisions in a house with no drywall. This is the list I walk through with homeowners before Dreamstead Builders starts a whole home remodel.
Step 1: Write Down Your Goals and Must-Haves
Start with a short written list of what the finished house has to do for your family, split into must-haves and nice-to-haves. That list becomes the yardstick for every design and budget decision that follows.
Most people come to the first meeting with photos. Photos help, but I learn more from how you live. When I sit down with a family, these are the questions I ask:
- Who works from home, and do they need a door that closes?
- Where do groceries, kids, and dogs come in?
- How many people need to get ready in the morning at the same time?
- Is a parent likely to move in, or will you want a bedroom on the ground floor later?
- How long do you plan to stay in this house?
- What do you hate about the house right now?
That last question is the most useful one. “The kitchen is dark and nobody can talk to the person cooking” tells Dreamstead Builders more than a folder of magazine kitchens.
If two people are making decisions, agree on the must-haves before the walkthrough. It’s fine to disagree about tile. It’s a problem to disagree about whether the house needs a fourth bedroom after drawings are done.
Step 2: Inspect the Structure and Systems First
Before you design anything, find out what the house is sitting on and what’s inside the walls. These findings set the real budget, and they’re much cheaper to learn now than during demolition.
Dreamstead Builders walks every house with this in mind. An older bungalow in Hyde Park or Travis Heights and a 1990s two-story in Round Rock have different problems, but every house has something. Here’s what to check:
| Area | What to look at | Why it matters before design |
|---|---|---|
| Foundation | Cracks, doors that stick, sloping floors | Austin’s clay soil moves, and repairs come before anything else |
| Framing and roof | Sagging lines, past leaks, undersized beams | Determines which walls can move and what support is needed |
| Electrical | Panel capacity, age and type of wiring | A new kitchen and HVAC may need more capacity than the panel has |
| Plumbing | Supply lines, drain lines, water heater | Old drains under a slab can change the bathroom plan |
| HVAC and ducts | Age, sizing, duct condition and layout | New systems should be sized for the finished house |
| Insulation and windows | Attic, walls, window condition | Easier to fix while walls are open |
If your house is in a historic district or has historic character you want to keep, add that to the list now. Those properties can need extra approvals, and the design has to respect what’s there. Our historic restoration page covers that kind of work.
Step 3: Set a Budget That Includes Contingency
Your budget needs three parts: the construction number, a contingency you don’t spend on upgrades, and the costs that sit outside construction. Most budget trouble comes from forgetting the second and third.
For the construction number, Dreamstead Builders publishes $100-150 per sq ft for a mid-range whole home remodel and $150-250+ per sq ft for luxury work. A 1,500 sq ft ranch with an updated kitchen, bathrooms, flooring, and systems typically lands at $150K-225K. Our Austin remodeling costs guide lays out the full ranges.
Treat contingency as its own line
Contingency isn’t padding. It’s money for what nobody can see until the walls are open: a rotted sill plate, wiring someone spliced in the attic, a drain line that’s been leaking for years. Older houses need more of it. Keep it as a separate line, decide in advance who approves spending it, and don’t borrow from it to upgrade countertops. If you get to the end and it’s unspent, that’s a good day.
Count what isn’t construction
These costs are real and they’re yours:
- Rent or a short-term place if you move out
- Moving and storage for furniture
- New furniture or window treatments for the new layout
- Appliances, if you’re buying them yourself
Write these down next to the construction number so you’re looking at the whole picture.
Step 4: Lock Design and Selections Before Demolition
Every selection that affects rough-in should be final before demolition starts. Once electrical, plumbing, and HVAC are installed and inspected, changing your mind means tearing that work out.
As Design Director at Dreamstead Builders, this is the step I push hardest on, because it’s where schedules slip. People assume they can pick the faucet later. Sometimes they can. But the faucet decides the valve, the vanity decides where the drain comes up, and the range decides whether you need a gas line and how big the hood and its venting have to be.
Here’s what needs to be decided before walls come down:
- Kitchen layout and cabinets, including appliance models and sizes (kitchen remodeling goes deeper on this)
- Bathroom fixtures: tub or shower, valve type, vanity size, toilet location
- Lighting plan: where fixtures, switches, and outlets go, room by room
- Flooring type in each room, since thickness affects transitions and door heights
- Windows and exterior doors, which can have long lead times
- Any smart home wiring, speakers, or cameras
Finish colors and hardware can come a little later, but write down when each decision is due. A simple selections schedule with dates keeps everyone honest, including us.
Step 5: Plan for Permits and Inspections
A whole house remodel needs permits for structural, electrical, plumbing, and mechanical work, and the drawings have to be ready before applications go in. That’s one more reason selections come first.
Which office reviews the plans depends on where the house is. A house inside Austin city limits goes through the City of Austin. A house in Georgetown, Lakeway, or Pflugerville goes through that city, and some properties outside city limits deal with the county. Some neighborhoods also have an HOA architectural review that has to sign off before work starts, so check your deed restrictions early.
Inspections happen along the way, most importantly before walls close. Dreamstead Builders handles the applications and inspections as part of the project, but you should know they exist, because the schedule is built around them.
Step 6: Decide Where You’ll Live
Decide early whether you’ll stay in the house or move out, because that choice changes the phasing plan and the budget. It’s not a decision to make the week demolition starts.
If the work touches the kitchen, all the bathrooms, or the main electrical and plumbing at the same time, plan on being out for at least part of the project. If you’re staying, Dreamstead Builders will need to know which rooms you must keep working. A few things to sort out either way:
- A lease or short-term rental that can flex if the schedule moves
- Where pets go while doors are open and crews are working
- School routes and commutes from wherever you’ll be
- Which furniture goes to storage and which stays
Step 7: Agree on Phasing and How the Job Runs
Phasing is the order the house gets taken apart and put back together, and it should be agreed on paper before work starts. On most whole home projects, Dreamstead Builders runs it like this:
- Demolition and protection of anything staying
- Structural work and foundation repairs
- Rough-in for electrical, plumbing, and HVAC
- Inspections, then insulation and drywall
- Cabinets, tile, flooring, trim, and paint
- Fixtures, final inspections, and a walkthrough with you
If you’re living in the house, the plan also says which area goes first and what stays usable, like keeping one bathroom working or setting up a temporary kitchen.
Settle how the job will run, too. Who is your one point of contact? How often do you meet on site? How is a change priced and approved in writing before the work happens? Those answers prevent most of the arguments I’ve seen on remodels.
Your Printable Whole House Remodel Checklist
Print this and keep it with your notes. Dreamstead Builders uses the same order with every homeowner.
Goals
- Must-haves and nice-to-haves written down
- Both decision-makers agree on the must-haves
- List of what you dislike about the house now
Structure and systems
- Foundation, framing, and roof checked
- Electrical panel and wiring assessed
- Plumbing supply and drain lines assessed
- HVAC, ducts, insulation, and windows reviewed
- Historic district or HOA status confirmed
Budget
- Construction number based on published ranges
- Contingency set as its own line
- Who approves contingency spending decided
- Rent, storage, moving, and furniture counted
Design and selections
- Layout and drawings approved
- Cabinets, appliances, fixtures, and lighting chosen
- Flooring and windows chosen
- Selections schedule with due dates
Permits
- Jurisdiction confirmed
- HOA review, if any, scheduled
Living plan
- Stay or move out decided
- Housing, pets, and storage arranged
Phasing
- Order of work agreed in writing
- Point of contact and meeting rhythm set
- Change approval process in writing